The systems installed by ACAS Engineering, made up of nearly 3km of pipework, were as follows:

Compressed air system

  • Full HPC/Kaeser system with oil-flooded screw compressor
  • Complete with drying and filtration to class 1.4.1
  • Press-fit stainless-steel pipework from 54mm down to 22mm

Mains water system (for drinking and food product cleaning)

  • 10,000L buffer tank
  • 2 off Grundfos vertical multi-stage (run & standby) pumps
  • Fine filtration with option for UV treatment
  • Press-fit copper pipework from 66.7mm down to 15mm
  • Press-fit stainless-steel pipework in production areas

Cold water system (for sinks, wash-down and hot water system feed)

  • 3,500L buffer tank
  • 2 off Grundfos vertical multi-stage (run & standby) pumps
  • Coarse filtration
  • Press-fit copper pipework from 66.7mm down to 15mm
  • Press-fit stainless-steel pipework in production areas

Hot water system (for sinks and wash-down)

  • 2 off 1,500L calorifiers
  • 2 off Grundfos vertical multi-stage pumps (one per calorifier)
  • Coarse filtration
  • Press-fit copper pipework 66.7mm to 22mm (flow), 54mm to 15mm (return)
  • Press-fit stainless-steel pipework in production area

Hot water production

  • 2 off Bosch 300kW commercial boilers
  • Enclosed primary circuit with circulation pumps and plate heat exchanger (PHE)
  • Secondary circuit with circulation pumps feeding into calorifiers
  • Full control system to operate boilers and circulation pumps

Low-pressure hot water system (office central heating)

  • 40 off radiators installed and piped up
  • All existing pipework modified or replaced where required
  • Previous boiler removed and provision for connection to new boilers made

Office welfare facilities

  • Existing gravity-feed system repaired and recommissioned
  • All toilets and sinks reconnected following facility refurbishment
  • Drinking water outlets installed from new Mains water system

Chilled water system

  • Glycol circulation system to feed chilled water to air handling units (AHUs)
  • 2 off Grundfos, large, variable-speed, vertical multi-stage (run & standby) pumps
  • Circulating 25% Glycol solution through a chiller feeding 3 off AHUs
  • AHUs used to cool production areas through ducting and wall plenums
  • Press-fit stainless-steel pipework from 108mm down to 45mm

Controls system

  • Centralised control panel with running and error notifications for all pumps
  • Level display and pump control system for each tank including dry-run protection
  • Connections for BMS if required

All systems

  • All 3-piece stainless steel valves
    • Negates the need for unions therefore reducing costs
    • Prolongs service life reducing costs and system downtime
  • All variable-speed pumps with Bluetooth connectivity
    • Maximum energy efficiency reducing costs and carbon footprint
    • Negates the need for flow control valves reducing costs
    • Increases efficiency of systems
    • Maximum system control
  • All high-flow filters 
    • Maximum service life
    • Increased system efficiency