The systems installed by ACAS Engineering, made up of nearly 3km of pipework, were as follows:
Low-pressure hot water system (office central heating)
- 40 off radiators installed and piped up
- All existing pipework modified or replaced where required
- Previous boiler removed and provision for connection to new boilers made
Chilled water system
- Glycol circulation system to feed chilled water to air handling units (AHUs)
- 2 off Grundfos, large, variable-speed, vertical multi-stage (run & standby) pumps
- Circulating 25% Glycol solution through a chiller feeding 3 off AHUs
- AHUs used to cool production areas through ducting and wall plenums
- Press-fit stainless-steel pipework from 108mm down to 45mm
All systems
- All 3-piece stainless steel valves
- Negates the need for unions therefore reducing costs
- Prolongs service life reducing costs and system downtime
- All variable-speed pumps with Bluetooth connectivity
- Maximum energy efficiency reducing costs and carbon footprint
- Negates the need for flow control valves reducing costs
- Increases efficiency of systems
- Maximum system control
- All high-flow filters
- Maximum service life
- Increased system efficiency
ACAS Engineering worked alongside several other contractors to ensure that the project was delivered exactly to client specification and functioned at the highest possible levels of efficiency and reliability, ensuring the client could proceed without concern for years to come.